Finally... My Overdue Overview (on the progress of our Custom House)

Where are we at?

The house has been going very well. After a summer of building, framing, digging, grading, retaining, roofing, prepping, installing, insulation and dry walling among other things, the custom built house in Montgomery is taking shape.

It's hard for me to believe in my last update I was talking about the gorgeous spring that we had. Although our progress has been great we did have some hiccups; with an unusually wet summer, and Hardy, who worked with me for more than a decade, decided to change careers which was a big blow and then, even more rain.


At last report we were just about to start framing the second floor. We did get to the second floor, the roof and windows and doors. The exterior finish of EIFS stucco and Board and Batten siding is about ½ way done at this point.

We decided to have Beyond Foam insulate the house with BASF’s Walltite Eco® a revolutionary spray foam insulation. BASF utilizes recycled materials as well as renewable resources to make the first 2lb spray foam to be given the EcoLogo® and it is purple.


At Durango Developments we feel that durable and energy efficient homes are extremely important especially with Calgary's climate. Using high efficiency furnaces, appliances, ICF foundation walls, spray foam insulation and triple pane low E windows throughout will all help keep the warmth in during the winter months and help the house stay cool in the summer. Keeping the weather outside with these and other eco products and materials also help the structure of the house by not allowing air, which carries moisture, through the walls. Moisture issues are becoming quite common building problems due to air moving through walls and preventing this helps stop moulds and other moisture issues from occurring.

We are weather tight and warm with temporary heat. We do not use our new furnaces to heat the house until closer to completion so as not to prematurely age and/or damage the new equipment. The drywallers have been busy boarding and now they are doing the finishing touches with their mudslinging and tape.

We are getting ready for the winter by completing some of the retaining walls and garage. After the weeks end we should have the garage framed and be back inside to start the finishing!


Give us a call to start planning your new custom project. We can make your current home better or start on a fresh set of plans...

White House progress report.

Thought I better provide an update on our latest custom home.

We have had a gorgeous spring in Calgary and have been building away on our latest custom home.

The sloping lot started to take shape with the energy efficient ICF foundation blocks. The concrete was poured on a cloudless day.

But it wasn't really until the main floor subfloor went on and we backfilled around the house that the lot and house took shape.

Most of our main floor walls are now up showing window and door openings. The very large opening on the front will have an impressive 14' Kolbe folding door system that will open the wall of windows up onto the not yet present deck.

We are now ready for the second floor engineered floor system to be delivered and in a few days we will be able to walk on the second floor! I can hardly wait to see the view from a little higher up.

Contact us now to start discussing your project ideas.

Exterior fail- what does it really look like?

Have you ever heard of a "leaky condo"? Well it doesn't just happen to condos.

The exterior of a house is a system that is called the building envelope. The building envelope is comprised of everything that is keeping the weather outside of the house, including siding, stucco, windows, doors, chimneys, etc. The details of the building envelope are more complicated when there is a hole in the structure... but admittedly windows and doors are pretty nice to have...

Read more

Having a custom built home doesn't have to cost you more

It is true that a custom home may require more design time and sometimes there are added features that can take more time to build. But is it really fair to say that it costs more if you are getting more?

By the time your design is finished and your product selections are chosen the cost of your custom home can be quite accurately estimated. In order to keep the costs for your custom home in line...

Read more

GC, Sparky or Tin Basher… what the heck is that?!?

Here are some common construction and design terms.

  • GC- General Contractor - this is the person who hires, manages, supervises and is responsible for all the people and trades working on your project. In residential construction often the GC and Project Manager are the same person.
  • Sparky - otherwise known as an Electrical Contractor, the subcontractor who installs the electrical, data, phone and automation features in your home.
  • Boutique builder - a builder focused...
Read more